ເຂື່ອນ ປາກແບງ Pak beng Dam

Location pak beng dam ທີ່ຕັ້ງເຂື່ອນປາກແບງ ເຂື່ອນໄຟຟ້າປາກແບງ ເມືອງ ແບງແຂວງອຸດົມໄຊ


ເຂື່ອນໄຟຟ້າປາກແບງເຂື່ອນໄຟຟ້າພະລັງງານນ້ຳ ປາກແບງ ເຂື່ອນປາກແບງ ແຂວງ ອຸດົມໄຊ ເຂື່ອນນ້ຳຂອງ ປາກແບງ ເຂື່ອນທີ່ໃຫຍ່ທີ່ສຸດ ໃນແມ່ນ້ຳຂອງ ເຂື່ອນປາກແບງ ເມືອງປາກແບງ ແຂວງ ອຸດົມໄຊ ເຂື່ອນ ຂະຫນາດໃຫຍ່ ແບບ Run-of-River ໂຄງການເຂື່ອນໄຟຟ້າປາກແບງ ຕົວຢ່າງລັກສະນະເຂື່ອນໄຟຟ້າປາກແບງ ແນວທາງການສ້າງເຂື່ອນໄຟຟ້າປາກແບງ ຂັ້ນຕອນການກໍ່ສ້າງເຂື່ອນໄຟຟ້າປາກແບງ ແຂວງອຸດົມໄຊ  Pak Beng Dam Pakbeng HHP Located in Beng distinct Pak Beng hydropower project is a 912MW run-of-river power project to be located on the mainstream of the Lower Mekong River in the Lao People's Democratic Republic. The run-of-river project will have an average annual energy production capacity of 4,765GWh.  Datang (Lao) Pak Beng Hydropower plans to develop the project with an investment of approximately $2.37bn.  The construction of the hydroelectric power plant will start in 2022 and is expected to be completed by 2029.  The reservoir capacity of the project will be 559 million m³ at a maximum water level of 340 meters above sea level (masl), while its backwater length will be 97km. Location : Pak Beng District, Laos  Installed Capacity : 912MW  Annual Production : 4,765GWh  Owner : Menkong River Commission

ເຂື່ອນໄຟຟ້າພະລັງງານນ້ຳ ປາກແບງ ເຂື່ອນປາກແບງ ແຂວງ ອຸດົມໄຊ ເຂື່ອນນ້ຳຂອງ ປາກແບງ ເຂື່ອນທີ່ໃຫຍ່ທີ່ສຸດ ໃນແມ່ນ້ຳຂອງ ເຂື່ອນປາກແບງ ເມືອງປາກແບງ ແຂວງ ອຸດົມໄຊ ເຂື່ອນ ຂະຫນາດໃຫຍ່ ແບບ Run-of-River ໂຄງການເຂື່ອນໄຟຟ້າປາກແບງ ຕົວຢ່າງລັກສະນະເຂື່ອນໄຟຟ້າປາກແບງ ແນວທາງການສ້າງເຂື່ອນໄຟຟ້າປາກແບງ ຂັ້ນຕອນການກໍ່ສ້າງເຂື່ອນໄຟຟ້າປາກແບງ ແຂວງອຸດົມໄຊ  Pak Beng Dam Pakbeng HHP Located in Beng distinct Pak Beng hydropower project is a 912MW run-of-river power project to be located on the mainstream of the Lower Mekong River in the Lao People's Democratic Republic. The run-of-river project will have an average annual energy production capacity of 4,765GWh.  Datang (Lao) Pak Beng Hydropower plans to develop the project with an investment of approximately $2.37bn.  The construction of the hydroelectric power plant will start in 2022 and is expected to be completed by 2029.  The reservoir capacity of the project will be 559 million m³ at a maximum water level of 340 meters above sea level (masl), while its backwater length will be 97km. Location : Pak Beng District, Laos  Installed Capacity : 912MW  Annual Production : 4,765GWh  Owner : Menkong River Commission





ເຂື່ອນໄຟຟ້າພະລັງງານນ້ຳ ປາກແບງ ເຂື່ອນປາກແບງ ແຂວງ ອຸດົມໄຊ ເຂື່ອນນ້ຳຂອງ ປາກແບງ ເຂື່ອນທີ່ໃຫຍ່ທີ່ສຸດ ໃນແມ່ນ້ຳຂອງ ເຂື່ອນປາກແບງ ເມືອງປາກແບງ ແຂວງ ອຸດົມໄຊ ເຂື່ອນ ຂະຫນາດໃຫຍ່ ແບບ Run-of-River ໂຄງການເຂື່ອນໄຟຟ້າປາກແບງ ຕົວຢ່າງລັກສະນະເຂື່ອນໄຟຟ້າປາກແບງ ແນວທາງການສ້າງເຂື່ອນໄຟຟ້າປາກແບງ ຂັ້ນຕອນການກໍ່ສ້າງເຂື່ອນໄຟຟ້າປາກແບງ ແຂວງອຸດົມໄຊ

Location ທີ່ຕັ້ງໂຄງການ

The Pak Beng Hydropower Project is the first in the cascade of hydropower projects on the mainstream of the Lower Mekong River, located at 298 meters (m) above the mean sea level (masl) and 2,188 kilometers (km) distance from the sea. The dam site is in the Pak Beng District, Oudomxai Province, northern Lao PDR, about 530 km downstream from Jinghong Hydropower (on the Lancang River or Upper Mekong River within China), 180 km from Chiang Saen (the first hydrological station on the Lower Mekong River), 174 km upstream of Luang Prabang and 258 km from Xayaburi Hydropower. The project site is situated in the north part of the Lower Mekong Basin, where the landform is mostly hills and mountains covered by natural forests.

Run-of-river project

The developer has indicated that the Pak Beng Hydropower Project is designed and operated as a run-of-river hydropower project with a total storage capacity of 559 million cubic meters (m3) at a normal water level of 340 masl, with daily regulation of capacity. This suggests that the outflow from the reservoir is equal to the inflow to the reservoir, meaning that the reservoir would not reserve water in the wet season for dry season power generation. Hence, the proposed project should not create a potential impact due to inter-seasonal flow distribution in the mainstream.


Power generation

The Pak Beng Hydropower Project consists of 16 bulb turbines of 57 megawatts (MW), totaling an installed capacity of 912 MW. The annual average energy production is 4,765 gigawatt per hour (GWh) (or the annual utilization time of 5,225 hours): 2,947 GWh in the wet season of June-November and 1,818 GWh in the dry season of December-May. Up to 10% of the power produced by the project will be made available to Électricité du Laos (EDL) and the surplus power will be supplied to Thailand.

Infrastructure and design

The complex structures of the project consist of water retaining structures, flood release structures, a powerhouse, a navigation ship lock, and a fish passage.
The water-retaining structures include a gravity dam, a powerhouse, discharge sluices, and a ship lock. The dam crest elevation is 346 masl, the maximum dam height is about 64 m, and the dam crest length is 896.70 m. The powerhouse is located on the left side of the main river channel, the discharge sluices are located on the right terrace, and the ship lock is arranged on the right bank.

The flood release structures consist of discharging sluices and sand outlets. The discharging sluices are located on the right side with 14 slices of 15 m wide × 23 m high. A stilling basin with energy dissipation is designed just behind the sluices. The sand outlets are within the powerhouse section, with an opening of 2.5 m wide × 5 m high, at 288.50 masl. They are constructed between every two generating units, with a total of 8 sand outlets.
The powerhouse consisting of 16 bulb turbines is on the left side of the main river channel, with a design discharge of 5,771 m3/s. The powerhouse section is 82.5 m long parallel to the water flow direction and 410 m in total along the dam axis. The main powerhouse spans 21 m, and the spacing of generating units is 20.5 m. An erection bay is constructed at both ends, and the auxiliary powerhouse is located on the downstream side of the main powerhouse, while the outgoing transmission line platform is situated on top of the auxiliary powerhouse.
The navigation structure is a one-way one-step ship lock for 500-ton ships, and a space for the ship lock for upgrading into a double-way lock is reserved. The maximum working head of the navigation lock is 32.38 m, and the size of the lock chamber is 120 m long × 12 m wide × 4 m deep. The one-line lock is being designed at the present time.

The complex structures of the project consist of water retaining structures, flood release structures, a powerhouse, a navigation ship lock and a fish passage. The water retaining structures include a gravity dam, a powerhouse, discharge sluices and a ship lock. The dam crest elevation is 346 masl, the maximum dam height is about 64 m, and the dam crest length is 896.70 m. The powerhouse is located at the left side of main river channel, the discharge sluices are located at right terrace, and the ship lock is arranged on the right bank. The flood release structures consist of discharging sluices and sand outlets. The discharging sluices are located on the right side with 14 sluices of 15 m wide × 23 m high. A stilling basin with energy dissipation is designed just behind the sluices. The sand outlets are within the powerhouse section, with an opening of 2.5 m wide × 5 m high, at 288.50 masl. They are constructed between every two generating units, with a total of 8 sand outlets. The powerhouse consisting of 16 bulb turbines is on the left side of the main river channel, with a design discharge of 5,771 m3/s. The powerhouse section is 82.5 m long parallel to the water flow direction and 410 m in total along the dam axis. The main powerhouse spans 21 m, and the spacing of generating units is 20.5 m. An erection bay is constructed at both ends, and the auxiliary powerhouse is located on the downstream side of the main powerhouse, while the outgoing transmission line platform is situated on top of the auxiliary powerhouse. The navigation structure is a one-way one-step ship lock for 500-ton ships, and a space for the ship lock for upgrading into a double-way lock is reserved. The maximum working head of the navigation lock is 32.38 m, and the size of the lock chamber is 120 m long × 12 m wide × 4 m deep. The one-line lock is being designed at the present time.

The fish passage is arranged on the left bank of the river, it is approximately 1.6 km long, 10 m bottom width, and 17.2 m top width. The slope is about 1.85%. Several pools will be set along the fish passage and serve as rest pools. The planned fish bypass channel entrance is some distance of about 1 km downstream of the dam wall. An observation room is set downstream of the service gate, and a counting, observing, and trapping facility will be equipped in this room.
The dam and water transfer structure are designed based on a 500-year return period (26,800 m3/s or 341.20 masl at reservoir) and checked based on a 2,000-year return period (30,200 m3/s or 343.74 masl at reservoir). Additionally, structures for energy dissipation and protection are based on a 50-year return period.
The Social Impact Assessment identified 26 villages in three provinces of Oudomxay, Xayabury, and Bokeo in Lao PDR to be directly impacted by the project with a total family of 923 or a population of 4,726.

Operation consideration

The main considerations of the operation of the proposed hydropower project focus not only on energy generation but also on navigation requirements, the impact on the natural reef of Keng Pha Dai, and the requirement for sediment management. Located on a navigable stretch of the Mekong mainstream, the project includes a navigation structure, which enables the passage of ships up to 500 tons. Additionally, to avoid a significant impact on navigation, the proposed dam does not use peak load regulation by operating with a low head and large discharge, i.e. the dam will only generate power as per inflow. The reef of Keng Pha Dai is collectively recognized as a natural monument for demarcating the national border between Thailand and Lao PDR.

Considering this important landmark, the appearance of the natural reef is surveyed and the water level is consequently maintained at 335 masl in the dry season and 340 masl in the wet season, to ensure visibility of the reef. Furthermore, the proposed dam is equipped with a sediment flushing facility such as a discharge sluice gate and low bottom holes under the powerhouse to ensure settled sediment carrying downstream properly. Comprehensive hydrological and sediment monitoring, before and after construction and during operation, will also be undertaken.

Developer and cost

The developer of the project is Datang (Lao) Pak Beng Hydropower Co., Ltd. The construction period is expected to be five years. The project is estimated to be worth around 2,372 million USD, in which 96% is attributed to hydropower construction and 4% is attributed to power transmission. Studies by the developer suggest reserving a total budget of 1.3 million USD for hydrological network construction, 0.5 million USD for sediment monitoring, and 0.6 million USD for annual operation and maintenance of the network.



ທີ່ຕັ້ງໂຄງການ : Pak Beng District, Laos ກຳລັງການຕິດຕັ້ງ : 912MW ພະລັງງານທີ່ຜະລິດໄດ້ : 4,765GWh ເຈົ້າຂອງໂຄງການ: Menkong River Commission ອົງການແມ່ນ້ຳຂອງ